Home / Products / Engineered Specialty Mortars / ECC High-Ductility Concrete

ECC High-Ductility Concrete DBJ 61/T 112-2021

A micromechanics-designed, high-ductility fiber-reinforced cementitious composite — the go-to for seismic strengthening and repair.

ECC High-Ductility Concrete packaging

ECC High-Ductility Concrete

Standard: DBJ 61/T 112-2021

A high-ductility fiber-reinforced cementitious composite designed on micromechanics principles. Through fiber bridging and multiple-cracking mechanisms, it delivers tensile strain capacity and energy dissipation far beyond ordinary concrete, and is used for seismic strengthening of existing buildings, structural reinforcement, and repair of bridges and tunnel linings.

Ultra-high ductilityMultiple steady crackingSeismic energy dissipationSelf-healingHigh durability
KEY FEATURES

Product Features

01

Ultra-high ductility

Tensile strain capacity far beyond ordinary concrete — highly deformable without brittle failure.

02

Multiple cracking

Develops many fine steady cracks that disperse deformation and avoid concentrated cracking.

03

Seismic dissipation

Excellent energy dissipation markedly improves seismic and collapse resistance.

04

Self-healing

Fine cracks show a degree of self-healing, improving long-term durability.

05

Firm bond

Bonds well with existing concrete and masonry, resisting delamination and spalling.

06

Flexible application

Troweled, sprayed or cast — adaptable to varied strengthening and repair conditions.

Technical Parameters

FormFiber-reinforced cementitious composite (dry powder, add water)
StandardDBJ 61/T 112-2021
ApplicationSeismic strengthening, masonry surface reinforcement, structural repair
PackingBagged, subject to factory packaging
QCEvery batch tested; test reports and certificates shipped with goods

Applications

  • Seismic strengthening of existing masonry and concrete structures
  • Surface strengthening and crack repair of brick-concrete buildings
  • Bridge deck continuity and girder repair
  • Strengthening and repair of tunnel linings and retaining walls
APPLICATION

Construction Steps

General application steps; refer to the technical brief for specifics

1

Surface prep

Remove dust, oil and loose material, repair obvious defects and wet the surface.

2

Bonding coat

Apply bonding agent as needed to enhance adhesion with the substrate.

3

Mixing

Mix to the specified water ratio until uniform, controlling flowability.

4

Placement

Place by trowel, spray or casting to the designed thickness.

5

Curing

Cover and moist-cure promptly to develop strength and ductility.

MA
CNAS
Batch-Tested · Traceable Quality

All products are produced to national / industry standards and tested by third-party laboratories. Reports carry MA / CNAS marks and the official inspection seal, and accompany every shipped batch with the certificate of conformity.

检测报告编号:J2025-02-W007477
High-Ductility Concrete Test Report
TEST REPORT

High-Ductility Concrete Test Report

湖南省产商品质量检验研究院出具 · 点击封面查看报告原图

RELATED

Related Products

Click a product to view its detail page