Home / Products / Engineered Specialty Mortars / Bridge Bearing Grout

Bridge Bearing Grout JT/T 1130-2017

Purpose-built for bridge pot / spherical bearing installation; ultra-early strength, slight expansion, high flow, workable at low temperature.

Bridge Bearing Grout packaging

Bridge Bearing Grout

Standard: JT/T 1130-2017

A factory-blended dry powder of high-strength cement, selected aggregate and multiple functional admixtures. Once mixed with water it delivers ultra-early strength, slight expansion and high flow with self-leveling, no-vibration placement. It fills completely and bonds firmly with bearings, bedding blocks and anchor bolts, and is widely used for bridge bearing bedding and installation grouting.

Ultra-early strengthSlight expansionHigh flow · self-levelingHigh compressive strengthDurable · oil-resistant
KEY FEATURES

Product Features

01

Ultra-early strength

Fast 2 h / 24 h strength gain shortens bearing installation and hoisting wait time, accelerating the schedule.

02

Slight expansion

Moderate expansion during hardening compensates shrinkage so the grout layer bonds tightly with bearing and bedding block.

03

High flow

Large initial flow, self-leveling and vibration-free, pumpable over long distances into complex forms.

04

Strong & durable

High compressive strength with durability and oil resistance for long-term dynamic and thermal loading.

05

Low-temperature workable

Stable performance in cold weather, keeping the schedule free of seasonal constraints.

06

Easy to use

Single-component dry powder — just add water and mix on site for consistent results.

Technical Parameters

FormSingle-component dry powder (add water and mix)
StandardJT/T 1130-2017
ApplicationBridge bearing bedding, pot / spherical bearing installation
PackingBagged, subject to factory packaging
QCEvery batch tested; test reports and certificates shipped with goods

Applications

  • Pot and spherical bearing installation for road and rail bridges
  • Bearing bedding leveling and secondary grouting
  • Bridge expansion joint and track pad filling
  • Early-strength grouting of equipment bases and anchor bolts
APPLICATION

Construction Steps

General application steps; refer to the technical brief for specifics

1

Surface prep

Roughen the bedding block, remove dust and oil, wet thoroughly but leave no standing water.

2

Formwork

Set up formwork to the grouting area, keeping joints tight and leak-free.

3

Mixing

Mix mechanically to the specified water ratio until uniform, then re-mix after a short rest.

4

Grouting

Pour continuously from one side by gravity so air escapes from the other; fill in one pass.

5

Curing

Cover and moist-cure promptly to prevent early water loss and thermal cracking.

MA
CNAS
Batch-Tested · Traceable Quality

All products are produced to national / industry standards and tested by third-party laboratories. Reports carry MA / CNAS marks and the official inspection seal, and accompany every shipped batch with the certificate of conformity.

RELATED

Related Products

Click a product to view its detail page