Dedicated backfill grout behind tunnel secondary lining; good injectability, slight expansion and firm bond to eliminate voids.

A purpose-designed grout for backfilling behind tunnel secondary lining. It offers high flowability, good injectability, slight expansion, firm bonding with surrounding rock and lining, plus durability and impermeability — effectively filling voids and under-compacted zones behind the lining to improve the tunnel's structural integrity and waterproofing.
Excellent flow and injectability to reach narrow gaps and voids behind the lining.
Moderate expansion gives fuller filling and tight contact with rock and lining.
Strong adhesion to existing concrete and surrounding rock for a monolithic load path.
Impermeable and durable, sealing water paths and improving tunnel waterproofing.
Non-shrinking, non-stratifying — the grout body stays dense and reliable over time.
Works with low- or high-pressure injection equipment across varied geological conditions.
| Form | Single-component dry powder (add water and mix) |
|---|---|
| Standard | T/CECS 1049-2022 |
| Application | Backfill behind secondary lining, voids behind primary support, shield tail grouting |
| Packing | Bagged, subject to factory packaging |
| QC | Every batch tested; test reports and certificates shipped with goods |
General application steps; refer to the technical brief for specifics
Lay out and drill grout holes on the lining to the designed depth.
Clear debris and water from holes, blow clean with high-pressure air if needed.
Mix to the specified water ratio until uniform, then sieve before use.
Inject from low to high pressure in stages, watching pressure and intake.
Seal the hole once full; after initial set, check density and re-grout if needed.
All products are produced to national / industry standards and tested by third-party laboratories. Reports carry MA / CNAS marks and the official inspection seal, and accompany every shipped batch with the certificate of conformity.
Click a product to view its detail page