Home / Products / Engineered Specialty Mortars / Prestressed Duct Grout

Prestressed Duct Grout JTG/T 3650-2020

Dedicated post-tensioning duct grout; high flow, long-distance pumpable, zero bleeding, slight expansion to protect strands from corrosion.

Prestressed Duct Grout packaging

Prestressed Duct Grout

Standard: JTG/T 3650-2020

A dedicated dry-powder grout for post-tensioned concrete ducts. It features high flowability, long-distance pumpability, slight expansion, zero bleeding and high filling capacity, fully filling the void between duct and strand and bonding tightly with the strand — the key material for protecting prestressing strands against corrosion and ensuring structural durability.

High flow · long-distance pumpableZero bleedingSlight expansion · high fillStrong bondCorrosion protection
KEY FEATURES

Product Features

01

High flowability

Flows well and pumps over long distances, filling complex and long ducts in one pass.

02

Zero bleeding

Near-zero bleeding means no water separation or stratification inside the duct — guaranteed density.

03

Slight expansion

Moderate expansion compensates shrinkage so the grout bonds tightly with duct wall and strand.

04

High filling

Full, void-free filling eliminates honeycomb and under-compaction defects.

05

Corrosion protection

Densely encapsulates strands, blocking moisture and chlorides to extend the life of the prestressing system.

06

Strong bond

Bonds firmly with strand and duct wall to ensure effective stress transfer.

Technical Parameters

FormSingle-component dry powder (add water and mix)
StandardJTG/T 3650-2020
ApplicationPost-tensioned duct grouting and anchorage sealing
PackingBagged, subject to factory packaging
QCEvery batch tested; test reports and certificates shipped with goods

Applications

  • Prestressed duct grouting for box / T girders on road and rail bridges
  • Duct grouting of post-tensioned concrete members
  • Anchorage and sealing filling
  • Other locations requiring high-flow, slight-expansion grout
APPLICATION

Construction Steps

General application steps; refer to the technical brief for specifics

1

Duct check

Verify the duct is clear and free of blockage and standing water before grouting.

2

Blow-out

Use high-pressure air to clear residual moisture and debris from the duct.

3

Mix

High-speed mix to the specified water ratio until uniform, then sieve before use.

4

Inject

Inject from the lowest point and vent at the highest, slowly and continuously.

5

Hold pressure

Close the vent once thick grout emerges, hold pressure, then seal and cure.

MA
CNAS
Batch-Tested · Traceable Quality

All products are produced to national / industry standards and tested by third-party laboratories. Reports carry MA / CNAS marks and the official inspection seal, and accompany every shipped batch with the certificate of conformity.

RELATED

Related Products

Click a product to view its detail page